Mr. N. Innocent Ohalete, P.E., M.ASCE is a registered Professional Engineer in the state of Texas and has over 23 years of Civil / Structural engineering experience in residential and commercial buildings including high-rise office buildings, hospitals, shopping centers, schools, estate master plan, water resources, sanitary sewer system, storm drainage, storm water quality management, flood plain mitigation, urban roadway and bridge design, site grading, pump station, traffic control design and construction. Mr. Ohalete has verse experience in design and construction of prefab buildings, especially the use of light weight steel structures and reinforced concrete structures.  He is well recognized and respected in the design-build industry and has done work in several states in the United State of America, the Virgin Islands, and Western Africa.

7531Design and construction of the 12,000 square feet of the 7531 Westview office steel framed building consisting of two story building, concrete parking lots, water and wastewater services lines, 75KVA electrical emergency power supply substation in Houston Texas.

 

ic_wwtp-aerialThe 12 million gallon reinforced concrete water storage tank for the City of Houston East Water Purification Plant including 400 linear feet of 60-inch transmission water main and 80 linear feet of 48-inch suction line.

 

03_IAH06The Houston Bush Intercontinental Airport terminal road and 8 level parking garage that accommodates approximately over 12,000 vehicles.

 

Kempinski-Hotel-Gold-Coast-City-AccraThe Master Plan Development of 120 acre tract of land in Accra Ghana near the Accra convention Center. The phase one of the project include design and construction of self-contained five star six story kempenski hotel building, two story concrete parking garage, onsite water treatment plant, onsite waste water treatment and onsite power generation system in Accra Ghana. Phase two of the project consists of seven high rise residential buildings, six high rise office buildings, three shopping complex with underground parking facilities, and roadways with manicured landscaping.

 

The 80 acre tract land development in Pearland, Texas housing about 120 bed hospital, 100 single family homes, shopping strip, access roads, storm drainage collection system, sewage treatment plant and pump station.

$30 million National Sewage system master plan for British Virgin Island consisting of five wastewater lift stations, 3,000 linear feet of 8-inch through 24-inch sanitary sewer mains, 36,000 linear feet of 6-inch through 30-inch of water main, and two water plants.